BUILDERS LOT PACKAGE

$15,000 Lot Package

1.   REMOVE STUMPS AND LOAD OUT

2.   STRIP LOAM AND STOCKPILE

3.   DIG HOUSE FOUNDATION WITH OR WITHOUT GARAGE AND BACK FILL

4.   DIG WATERLINE TRENCH AND BACK FILL

5.   DIG ELECTRIC TRENCH AND BACK FILL

6.   INSTALL SEPTIC TANK

7.   INSTALL SEPTIC SYSTEM

8.   FINAL GRADE LOT

9 .  PREP DRIVEWAY WITH STONE OR PROCESS

10. SPREAD LOAM

​

This includes all components and materials needed for the septic system assuming it is a sand system with plastic chambers and does not require a remove and replace.Stone systems,concrete chambers and remove and replace would be an additional cost priced upon additional time and materials.

​

Price will include the foundation footing being back filled with onsite sand or fill.builder must pay extra for crushed stone.we will install any inside footing parimeter drain pipe and/or sump bucket provided by builder at no additional cost for labor.

​

Sono tubes provided by builder will be dug and backfilled at no additional cost.

​

Price includes one 28yd trailer removal of stumps.Builder to assume cost of trailer loads above and beyond that.

​

Garage and basement footing will be plate compacted.

​

All lots are different but our price is for the average size lot give or take but if the lot is enormous and needs fill hauled in or hauled out its obvious the lot will need to be priced accordingly.

​